Main Contractor
Balfour Beatty
Engineer
CJP
Architect
Ryder

|
St Peters Campus
Project Details:
A new build extension to Sunderland Polytechnic including a media centre and visual arts college.
Scope of Works:
The design, supply and installation of a 3.6m wide bespoke spiral stair servicing two floor levels. The contract included glazed balustrade panels and shallow pan treads.
|