Main Contractor
Narec (New and Renewable Energy Centre)
Engineer
Dorman Long

|
Blade Testing Facility
Project Details:
A new research facility into alternative forms of energy concentrating on wave and wind power. The design of the turbine blades required a series of steel anchorages to be cast into large concrete plinths.
Scope of Works:
The supply and installation of two 10 tonne anchorage assemblies with associated access platforms and walkways, servicing a new research facility in Blyth.