Main Contractor
Bowey Construction
Engineer
Cundall Johnson
Architect
Cundall Johnson

|
Cramlington Shopping Centre
Project Details:
A design and build balustrade project using glazed panels with stainless steel and timber top rails.
Scope of Works:
The design and installation of a high quality balustrade system mounted on elliptical and ramped terraces as a feature in the central arcade. Materials used included toughened glass and iroko timber handrails.
|